View Single Post
  #12  
Unread 02-13-2011, 08:33 PM
Spokes Spokes is offline
Senior Member
 
Join Date: Apr 2009
Posts: 1,575
Default

Time Stamp 2-13-2011

It's been awhile since my last update with this project. All of the sheet metal parts have been cleaned and are awaiting sandblasting. I have collected replacement side covers (found metal ones) a carb cover, wheel bearings and cables. The controls have been polished and stored. I have found a rear hub and will relace the rear rim. The engine will be cleaned up and tuned with new ignition parts. I am going to mount the engine and try to start it. The bike should be assembled in June or July.

This bike already has MN plates waiting to mount.

Last edited by Spokes; 02-13-2011 at 08:33 PM. Reason: sp
Reply With Quote