View Single Post
  #13  
Unread 11-17-2011, 12:29 AM
htibaja htibaja is offline
Junior Member
 
Join Date: Jun 2011
Posts: 10
Default Back from IndonesiaFinally working on truck again

After my two moth trip to indo surfing finally back working on the truck.

started assembling the adapter plate and flywheel setup that 4u2quick hooked me up with. Fit together perfect. Came with all the fittings and everything seamless assembly. if you are ever gonna run an r series behind a 1uz this is the easiest way to do it. Im only throwing stock horsepower at it but it is in an offroad race application so i am gonna run it through the ringer. here are some photos

first had to cut the spacer tube on the r151F so that the hydrolic throwout bearing would slide all the way to the adapter plate. Then attached the adapter plate and throwout bearing assembly. Two holes had to be drilled to allow the hydrolic lines to exit the bell housing. I am waiting for new flywheel bolts and clutch bolts but as soon as they are here that baby is going on and then i can make the trans cross member.

Also been working on minor stuff brackets and closing up the points where the cage goes through the firewall
Attached Images
File Type: jpg 2011-11-11_16-25-58_707.jpg (124.7 KB, 4 views)
File Type: jpg 2011-11-11_16-25-47_104.jpg (124.8 KB, 4 views)
File Type: jpg 2011-11-11_16-31-00_87.jpg (97.2 KB, 3 views)
File Type: jpg 2011-11-11_16-35-00_501.jpg (134.1 KB, 4 views)
File Type: jpg 2011-11-11_17-10-41_792.jpg (145.2 KB, 6 views)
Reply With Quote