9-23-2012
The bike is finished. I will install a white seat as soon as the cover is delivered. Then the last item to be installed is the tank badges.
The bike sports a CA95 swing arm & chain guard, an external CB92 throttle, a rebuilt headlight and a CA95 tank. The bars and speedometer were repaired as well.
It has come a long way since May.